INSTALACIONES DE PAC® SYSTEM

PROPIETARIO DE LA EMPRESA (A/E)

TAMAÑO 
[Mw(e)] (1)

FLUJO DE VAPOR
[Lb/Hr]

TURBINA BP
[IN HgA]

DISEÑO DE TEMP.
[deg. F]

AÑO

       OBSERVACIONES

Exeter Energy L. P. Project
Oxford Energy

Sterling, CT

30

196,000

2.9

75

1989

       SISTEMA PAC®

     (W-T-E)

Streeter Generating Station
Municipal Electric Utility

City of Cedar Falls, Iowa
Cedar Falls, Iowa

(Stanley Consultants)

40

246,000

3.5

50

1993

Convertido de Húmedo a SISTEMA PAC®

(Ciclo Combinado)

Tucuman Power Station
Pluspetrol Energy, S.A.

El Bracho, Tucuman, Argentina

(Black & Veatch International)

150

1,150,000

5.0

99

1997

SISTEMA PAC®

(Ciclo Combinado)

Grumman
TBG Cogen

Bethpage, NY
(General Electric)

13

105,700

5.4

59

1997

Convertido de ACC a SISTEMA PAC®

(Ciclo Combinado)

SEMASS WTE Facility
American Ref-Fuel

Rochester, MA
(Bechtel, Inc.)

54

407,500

3.5

59

1999

Convertido de ACC a SISTEMA PAC®

(W-T-E)

Goldendale Energy Project
Goldendale Energy, Inc.

Goldendale, Washington
(NEPCO)

110

678,000

4.5

90

2000

SISTEMA PAC®

(Ciclo Combinado)

Comanche, Unit 3    
Xcel Energy

Pueblo, Colorado    
(Shaw Stone & Webster)

750

3,374,300

3.73

97

2006

SISTEMA PAC®

(Carbón)

Afton Generating Station    
Public Service of New Mexico

Las Cruces, New Mexico
(POWER Engineers)

148

594,981

5.0

98

2006

SISTEMA PAC®

(Ciclo Combinado )