Reliability
Powered by Experience.
Picture Picture Picture Picture Picture

Instalaciones de Bulk Air Cooler

ESTACIÓN PROPIETARIA (A/E)

TAMAÑO[Mw(e)] (1)

FLUJO DE VAPOR[Lb/Hr]

TURBINA BP [IN HgA]

DISEÑO DE TEMP.
[deg. F]

 OBSERVACIONES

Rustenburg Platinum Mines
Johannesburg Consolidated Investments

Johannesburg, South Africa

 

 

Concrete

 

 Splash Grid

 

 1989

Forced Draft

Ventiladores Axiales

Oryx Gold Mine (Phase 1)
GENCOR

South Africa

 

 4755

 

Concrete

 

Splash Grid

 

 1990

Forced Draft

Ventiladores Axiales

Oryx Gold Mine (Phase 2)
GENCOR

South Africa

 

 4755

 

Concrete

 

Splash Grid

 

 1992

Forced Draft

Ventiladores Centrífugos

Freddies Gold Mine
Anglo American Corporation

South Africa

 

 

Concrete

 

Splash Grid

 

 1992

Forced Draft

Ventiladores Axiales

Unisel
GENMIN

South Africa

 

 7132

 

Concrete

 

Splash Grid

 

 1993

Forced Draft

Ventiladores Centrífugos

Joel Mine �
Design and drawings only
JCI

South Africa

 

 

Concrete

 

Splash Grid

 

 1994

 

 Forced Draft

Meikle Mine Project
Barrick Goldstrike Mines, Inc

Carlin, Nevada

11,380

2 x 3170

 

Concrete

 

Splash Grid

 

 1993

Evap. Enfriador de Aire

2 Torres de Enfriamiento

Amandelbult, Rusteburg
AMPLATS

South Africa

 

 6340

 

Concrete

 

Splash Grid

 

 2000

Forced Draft

Ventiladores Axiales

Barrick Goldstrike Mines, Inc
Rodeo Creek Project

Carlin, Nevada

 

 3,170

 

Concrete

 

Splash Grid

 

 2000

 

Evap. Enfriador de Aire