PAC System InstallationsSTATION OWNER (A/E) | SIZE [Mw(e)] (1) | STEAM FLOW [Lb/Hr] | TURBINE BP [IN HgA] | DESIGN TEMP. [deg. F] | YEAR | REMARKS | Exeter Energy L. P. Project Oxford Energy
Sterling, CT | 30 | 196,000 | 2.9 | 75 | 1989 | PAC SYSTEM® (W-T-E) | Streeter Generating Station Municipal Electric Utility
City of Cedar Falls, Iowa Cedar Falls, Iowa (Stanley Consultants) | 40 | 246,000 | 3.5 | 50 | 1993 | Converted Wet to PAC SYSTEM (Combined Cycle) | Tucuman Power Station Pluspetrol Energy, S.A. El Bracho, Tucuman, Argentina (Black & Veatch International) | 150 | 1,150,000 | 5.0 | 99 | 1997 | PAC SYSTEM (Combined Cycle) | Grumman TBG Cogen Bethpage, NY (General Electric) | 13 | 105,700 | 5.4 | 59 | 1997 | Converted ACC to PAC SYSTEM (Combined Cycle) | SEMASS WTE Facility American Ref-Fuel Rochester, MA (Bechtel, Inc.) | 54 | 407,500 | 3.5 | 59 | 1999 | Converted ACC to PAC SYSTEM (W-T-E) | Goldendale Energy Project Goldendale Energy, Inc. Goldendale, Washington (NEPCO) | 110 | 678,000 | 4.5 | 90 | 2000 | PAC SYSTEM (Combined Cycle) | Comanche, Unit 3 Xcel Energy Pueblo, Colorado (Shaw Stone & Webster) | 750 | 3,374,300 | 3.73 | 97 | 2006 | PAC SYSTEM (Coal Fired) | Afton Generating Station Public Service of New Mexico Las Cruces, New Mexico (POWER Engineers) | 148 | 594,981 | 5.0 | 98 | 2006 | PAC SYSTEM (Combined Cycle) |
|
|
|
|