Reliability
Powered by Experience.
Picture Picture Picture Picture Picture

Bulk Air Cooler Installations

STATION OWNER (A/E) SIZE
[Mw(e)] (1)
STEAM FLOW
[Lb/Hr]
TURBINE
BP [IN HgA]
DESIGN TEMP.
[deg. F]
REMARKS

Rustenburg Platinum Mines
Johannesburg Consolidated Investments

Johannesburg, South Africa

 

Concrete

Splash Grid

1989

Forced Draft

Axial Fans

Oryx Gold Mine (Phase 1)
GENCOR

South Africa

4755

Concrete

Splash Grid

1990

Forced Draft

Axial Fans

Oryx Gold Mine (Phase 2)
GENCOR

South Africa

4755

Concrete

Splash Grid

1992

Forced Draft

Centrifugal Fans

Freddies Gold Mine
Anglo American Corporation

South Africa

 

Concrete

Splash Grid

1992

Forced Draft

Axial Fans

Unisel
GENMIN

South Africa

7132

Concrete

Splash Grid

1993

Forced Draft

Centrifugal Fans

Joel Mine
Design and drawings only
JCI

South Africa

 

Concrete

Splash Grid

1994

Forced Draft

Meikle Mine Project
Barrick Goldstrike Mines, Inc

Carlin, Nevada

11,380

2 x 3170

Concrete

Splash Grid

1993

Evap. Air Cooler

2 Cooling Towers

Amandelbult, Rusteburg
AMPLATS

South Africa

6340

Concrete

Splash Grid

2000

Forced Draft

Axial Fans

Barrick Goldstrike Mines, Inc
Rodeo Creek Project

Carlin, Nevada

3,170

Concrete

Splash Grid

2000

Evap. Air Cooler